The Corporation of London commissioned Ground Sun to design and construct steel fishing platforms in Epping Forest. The sites were not suitable for heavy machinery or plant and so a specialist handheld pneumatic pile driver was used to install 2.8m long and 125mm diameter steel piles for the fishing platforms in these environmentally sensitve areas.